Crane safety monitoring requirements
Crane safety monitoring requirements
Author: Unknown Source: State General Administration of Quality Supervision, Inspection and Quarantine
Crane safety monitoring requirements
The State Administration of Quality Supervision, Inspection and Quarantine Order No. 92
Issued: 20,061,229 implementation date: 20,070,601 issued: State Administration of Quality Supervision, Inspection and Quarantine
Chapter I General Provisions
The second chapter of the crane manufacturing
Chapter lifting machinery installation transformation maintenance
Chapter lifting machinery use
Chapter V Supervision and Inspection
Chapter VI Legal Liability
Chapter VII Supplementary Provisions
On November 27, 2006 the State Administration of Quality Supervision, Inspection and Quarantine Bureau meeting examined and adopted, are hereby promulgated, and shall come into force on June 1, 2007.
General Administration of Quality Supervision, Inspection and Quarantine of the Peoples Republic of China
December 29, 2006
Chapter I General Provisions
In order to strengthen the crane safety monitoring work to prevent and reduce the lifting machinery accident, and the protection of personal and property safety, according to the "Regulations on Safety Supervision of Special Equipment enactment of this provision.
The second lifting machinery manufacturing, installation, alteration, repair, use, inspection and testing its supervision and inspection, it shall comply with the provisions.
Housing construction sites and municipal engineering site with lifting machinery installation, supervision and management in accordance with the provisions of relevant laws and regulations.
Article 3 The State Administration of Quality Supervision, Inspection and Quarantine (hereinafter referred to as AQSIQ) is responsible for the national crane safety monitoring work, the local quality and technical supervision departments above the county is responsible for the administrative area of lifting machinery safety supervision.
The second chapter of the crane manufacturing
The fourth manufacturing units shall have obtained the the crane manufacturing license, before engaging in manufacturing activities.
Lifting machinery manufacturing license to implement hierarchical management, manufacturing units to obtain a manufacturing license should have the appropriate conditions, the specific requirements in accordance with the safety-related technical specifications and requirements.
The fifth crane manufacturing license is valid for four years.
The manufacturing unit shall submit a written application for changing the permit expiry of six months ago; After examination, the licensing department should be made before the expiration date to approve the license or not to license the decision.
Crane manufacturing license expiry without renewal, shall not continue to engage in crane manufacturing activities.
The sixth manufacturing units should meet the safety requirements of technical specifications lifting machinery design file.
Seventh type tests should be conducted in accordance with the technical specifications security requirements, lifting machinery products, parts or trial lifting machinery new products, new parts, must be the whole or part of the type test.
Article crane manufacturing process should be the scope of the project and requirements prescribed in accordance with the norms of security technology, Supervision, Inspection and manufacturing location of inspection and testing institutions.
Article 9 manufacturing units shall be manufactured in licensed establishments within the lifting machinery; structure can not be split and overrun transport can use the on-site manufacturing supervision and safety of technical specifications and other requirements by the testing organization in accordance with the inspection of the manufacturing site is located inspection.
Article manufacturing unit shall be the main force structure (main beam, main and auxiliary jib, main support legs, standard section, the same below) All commission processing or purchased and used for lifting machinery manufacturing.
Main force structure needs some commission processing or purchase the manufacturing unit should be commissioned to obtain the corresponding lifting machinery type and level of qualification manufacturing units processing or purchase of its processing force structure and for lifting machinery manufacturing.
Article 11 lifting machinery factory, it should be accompanied by a design document (including the General Plan, the main force structure diagram, the mechanical transmission diagrams and electrical, hydraulic system schematic), product quality certification, installation, use and maintenance instructions, Supervision, Inspection and prove the type test pass certificate file.
Chapter lifting machinery installation transformation maintenance
Article XII of lifting machinery installation, alteration, maintenance units shall obtain the installation, alteration, repair permission before engaging in appropriate activities.
The lifting machinery installation, alteration, repair permission implement hierarchical management, installation, alteration, maintenance units for installation, alteration, repair license shall have the appropriate conditions, the specific requirements in accordance with the safety-related technical specifications and requirements.
Engaged in lifting machinery renovation activities, should have the appropriate type and level of lifting machinery manufacturing capacity.
Article XIII lifting machinery installation, alteration, repair license is valid for four years.
Installation, alteration, maintenance organization shall submit a written application for changing the 6 months prior to the expiration of the license is valid; After examination, the licensing department should be made before the expiration date to approve the license or not to license the decision.
Lifting machinery installation, alteration, maintenance, license expiry without renewal, shall not continue to engage in lifting machinery installation, alteration and maintenance activities.
Article XIV engaged in the installation, alteration, repair units should be in accordance with the provisions of the quality and technical supervision departments inform, inform before construction.
Mobile operations and the need to re-install the lifting machinery, off-site installation, shall be subject to the location of construction quality and technology supervision departments handle the installation informed before construction.
Informed before the construction should be in writing, inform the contents include: unit name, license ISBN and Contacts, the name and contact information of the use of units, the construction project, the proposed construction of lifting machinery, Supervision, Inspection and certificate number, type test certificate number, construction location, construction plan, construction date, the permittee workers list.
Installation, renovation, major maintenance 15 units should be in the pre-construction to the construction of the seat of inspection and testing agencies apply for Supervision and Inspection.
Inspection and testing agencies shall conduct supervision and inspection, to the construction site supervision and inspection performed in accordance with the technical specifications corresponding security requirements.
Article 16 installation, alteration, maintenance units shall, within 30 days after the construction inspection, the installation, alteration, maintenance technical information into use.
Chapter lifting machinery use
Article XVII of lifting machinery in the 30 days before it is put into use, or put into use, the use of the unit shall be subject to the registration department for registration to use.
Lifting machinery, the use of units of the current job should be to the property unit of local registration department for the use of registration.
Article 18, lifting machinery use units change, the original use of the unit shall, within 30 days after the change to the original registration department for the use of the registration and cancellation; new use units shall be in accordance with the regulations to the local registration department for use of registration.
The hoisting machinery scrapped 19, the use of the unit should be to the registration department in the use of the registration and cancellation.
The hoisting machinery use units in Diershitiao should fulfill the following obligations:
(A) the use of the unit with the appropriate licensing qualification manufacturing and with the supervision and inspection of lifting machinery;
(B) to establish and improve the appropriate use of lifting machinery safety management system;
(C) setting the crane safety regulatory agencies with expertise (part-time) security management personnel engaged in crane safety management;
(D) training of the lifting machinery operating personnel security technology to ensure its mastery of the knowledge of the operational skills and accident prevention, and enhanced security awareness;
(E) routine maintenance of major structural components of the force on the lifting machinery, safety accessories, safety protection devices, running institutions, control system, and make a record;
(F) with rigging, spreader meet safety requirements, strengthen daily safety checks and maintenance, rigging, spreader safe to use;
(G) to develop a the hoisting machinery emergency rescue plan, based on the need to establish emergency rescue team and exercises regularly.
Article 21 The use of units should be set up heavy machinery safety file. The crane safety file should include the following:
(A) design documents, product quality certification, supervision and inspection certificate installation files and data, use and maintenance instructions;
(B) the security protection device type test certification;
(C) the periodic inspection reports and periodic self-inspection records;
(D) daily usage records;
(E) day-to-day maintenance records;
(F) operational failure and accident records;
(G) registration certificate.
Article 22 of the periodic inspection of lifting machinery longest cycle of not more than two years, the implementation of the different categories of lifting machinery inspection cycle in accordance with the appropriate security technology specification.
Using the unit shall be one month before the expiry of the periodic inspection is valid periodic inspection application to the inspection and testing institutions.
Lifting machinery in different places of the mobile operations, the use of the unit shall be in accordance with the inspection cycle and other requirements apply to the use of local inspection and testing organizations for periodic inspection, using the unit shall test results reported registration department.
Article 23 of the old hoisting machinery shall meet the following requirements to use the unit in order to put to use:
(A) The use of registration cancellation certificate with the original use of the unit;
(B) using the registration certificate with the new use of the unit;
(3) has a complete security technology file;
(D) Supervision, Inspection and periodic inspection.
Article 24 of the lifting machinery leased the use of the unit should be in accordance with the provisions of Article XX (e) provides that the lessee to use during the day-to-day maintenance of lifting machinery and records, are responsible for the safety of the use of leasing lifting machinery .
Prohibit the tenant to use the following lifting machinery:
(A) is not used in the registration department registered;
(B) there is no complete security technology file;
(C) Supervision, Inspection and regularly passed the inspection.
Demolition of lifting machinery Article 25 should be implemented by units of the corresponding installation license qualification.
Before lifting machinery demolition construction a thorough demolition work instructions, should be developed to be constructed in accordance with the requirements of the demolition work instructions to ensure that lifting the mechanical safety of the demolition process.
Article 26 lifting machinery with one of the following circumstances, the use of units shall promptly be scrapped and destruction measures taken disintegration:
(A) there is a serious potential accidents, alteration, repair value;
(B) to the security technical specifications and other provisions of the design life span or end-of-life conditions.
Failure or abnormal conditions of Article 27 of the lifting machinery, the use of the unit should stop using its comprehensive inspection to eliminate failure and accidents before they are allowed back into use.
Article 28 of the lifting machinery accident, and use must be in accordance with the relevant provisions of the requirements, and report to the local quality and technical supervision departments and relevant departments in a timely manner.
Chapter V Supervision and Inspection
Article 29 The quality and technical supervision departments in accordance with the relevant requirements of the Regulations on Safety Supervision of Special Equipment "and the provisions of lifting machinery manufacturing, installation, alteration, repair, use, inspection and testing of the implementation of a safety monitoring.
Article 30 The quality and technology supervision department of safety inspectors and administrative law enforcement personnel engaged in security monitoring activities, shall be devoted to adhere to principles, and enforce the law impartially and according to law enforcement.
Article 31 of the quality and technical supervision departments in safety supervision, the local peoples governments and relevant departments to support and cooperate to deal with the lifting machinery potential accidents or violations, shall promptly report or notify the local government and relevant departments of the people.
Article 32 crane safety investigation and handling of the accident, in accordance with relevant state regulations.
Chapter VI Legal Liability
Article 33 in violation of the provisions of Article VI, shall be ordered to make corrections, shall be fined not more than 20,000 yuan to 30,000 yuan.
Article 34 manufacturing units in violation of the provisions of Article IX, not in the premises of licensed manufacture of lifting machinery, shall be ordered to make corrections, shall be fined not more than 20,000 yuan to 30,000 yuan.
Article 35 Where, in violation of the provisions of Article 10 of the first or second paragraph, shall be ordered to make corrections, shall be fined not more than 10,000 yuan to 30,000 yuan.
Article 36 of the lifting machinery use units change, the original use of the units in violation of the provisions of Article XVIII, not 30 days after the change to the original registration department for use to cancel the registration, be ordered to correct, a fine of more than $ 2,000 2 million fine.
Article 37 use does not comply with the provisions of Article 23 (a) requires the lifting machinery, shall be ordered to make corrections, shall be fined not more than $ 2,000 to 20,000 yuan.
Violation of the provisions of the provisions of Article 24 (2) Article 38 shall be ordered to make corrections, shall be fined not more than $ 2,000 to 20,000 yuan.
Violation of the provisions of Article 39 of the provisions of Article 25 (2), shall be ordered to make corrections, shall be fined not less than 10,000 yuan.
Other requirements, in violation of the provisions of Article 40 constitute the "Regulations on Safety Supervision of Special Equipment the illegal act in accordance with its provisions, the imposition of penalties.
Article 41 of the the lifting machinery safety inspectors and other administrative law enforcement personnel work the abuse of authority, dereliction of duty, corruption, and shall be held liable.
Chapter VII Supplementary Provisions
Article 42 The term of lifting machinery, lifting machinery under Article 88 of the "Regulations on Safety Supervision of Special Equipment, including its subsidiaries, safety accessories and safety protection devices.
The lifting machinery specific category (type), variety (type) executed in accordance with the State Council approved the directory.
Article 43 of the provisions of the following terms:
Transformation, the original lifting machinery major force structure change, the main material, the main configuration control system, resulting in the change of the original performance parameters and technical indicators activities.
Repair, remove or replace the original main parts, adjust the control system, the replacement of the safety accessories and safety protection devices, but does not change the original performance parameters and technical indicators lifting machinery repair activities.
Major repair, remove or replace the original main force structure, configuration, control system, but does not change the original performance parameters and technical indicators lifting machinery maintenance activities.
Article 44 of the hoisting machinery workers, supervision and management of the inspection bodies and inspection personnel, in accordance with the relevant provisions of the.
Responsible for the interpretation of the provisions of Article 45 by the State General Administration of Quality Supervision, Inspection and Quarantine.
Implementation of the provisions of Article 46 since June 1, 2007.