The single girder wire rope hyacinth old quit, old broken rope guides what?
Q: lifting weight of 10 tons, the single beam gourd old wire rope quit, and often mess together, and sometimes the volume into the reel go inside, the rope guides often broken machine, this is new did not take long equipment (ieand occasionally lifting about 5 tons of cargo), is how is it?
A:The general result of the cable-stayed, stayed crooked crane wire rope deformation.
Possible causes:
Rope specifications and roll the rope groove does not match (to replace the corresponding specifications of wire rope)
2 -, single girder hoist the bottom of the housing recessed guide rope moves blocked
Rope damaged bending easy to quit.
4, the guide rope quality problems, there may appear in the guide rope and wire rope, reel mismatch, detailed examination of the equipment will be able to know.
The new equipment, in the case of exclusion of equipment defects, the most important is the operator illegal operations, crooked pull oblique hanging or wire rope dropped too much, roll rewind the wire rope caused.